Uzbekistan Economy Finance Technologies Culture Sports Tourism World Media OutReach Newswire
Economy

New gas well commissioned at Shimoliy Berdak field

UzDaily · 16.03.2020 · 19:33 · 245 views
New gas well commissioned at Shimoliy Berdak field

Tashkent, Uzbekistan (UzDaily.com) –– Drilling operations at well No. 81 of the Shimoliy Berdak field of the Ustyurt Gas Production Directorate have been completed.

As a result of the perforation work in the intervals of 2613-2598m, 2380-2376m, 2340-2332m, an industrial gas inflow with a daily flow rate of 70 thousand cubic meters was obtained.

UzDaily · 👁 245 views · 16.03.2020 · 19:33