Uzbekistan

Hydraulic Testing of Heating Networks Underway in Tashkent as Part of Winter Preparations

Hydraulic Testing of Heating Networks Underway in Tashkent as Part of Winter Preparations
Hydraulic Testing of Heating Networks Underway in Tashkent as Part of Winter Preparations

Tashkent, Uzbekistan (UzDaily.uz) — From 30 May to 17 July 2025, scheduled hydraulic tests are being conducted across the capital to assess the strength and integrity of the city’s heating networks, according to a statement from Veolia Energy Tashkent’s press service.

These tests are part of routine preparations for the upcoming heating season and will not affect the supply of hot water.

However, during the testing process, localized pipeline damage and discharges of hot water onto roads and sidewalks may occur.

The company urges drivers, pedestrians, and those working or residing near administrative buildings to exercise caution, stay alert, and follow the instructions of on-site personnel.

In case of any damage or emergency situations involving the heating networks, residents are advised to promptly report incidents by calling the short number 1347.

Askar Yakubov
Askar Yakubov

Askar Yakubov is a professional photojournalist with extensive experience in news and reportage photography. He specializes in fast-paced coverage of social, political, cultural, international, business, and community events, with a sharp eye for capturing expressive shots and conveying the atmosphere of an event under tight time constraints. His skill set spans reportage, portrait, and documentary photography, along with image editing and color correction, and preparing photo materials for media and digital platforms. He is known for his professionalism, adherence to editorial standards, and ability to work both independently and as part of a shooting team.