Uzbekistan

Tashkent to begin hot water shutdowns from 5 October

Tashkent to begin hot water shutdowns from 5 October
Tashkent to begin hot water shutdowns from 5 October / Photo: UzDaily.

Tashkent, Uzbekistan (UzDaily.uz) — Another round of scheduled hot water supply shutdowns will take place in the capital from 5 to 9 October. Temporary restrictions will affect selected mahallas in the Mirobod, Yashnobod, Sergeli, Yangihayot and Bektemir districts.

Separately, hot water will be shut off at local boiler facilities according to individual schedules linked to specific residential buildings and other facilities.

Mirobod district

Mahallas: “Baratqodja,” “Parvona,” “Chinor,” “Yuksalish,” “Yangi Kuylik,” “Tolarik,” “Ziyo Nur,” “Bilimdon,” “Faizabad,” “Sarykul,” “Qorasuv,” “Oltinkul,” “Furqat,” “Abdurauf Fitrat.”

Yashnobod district

Mahallas: “Katta Kuylik,” “Mumtoz.”

Sergeli district

Mahallas: “Uzgarish,” “Habibiy,” “Mehrigiyo,” “Madadkor,” “Ziynat,” “Yangi Sergeli,” “Sohibkor,” “Sofdil,” “Nilufar,” “Ittifoq,” “Nurhayot,” “Sahovat,” “Kipchak,” “Xalqobod,” “Madaniyat,” “Birdamlik,” “Shukrona,” “Kushkurgon,” “Quruvchilar,” “Farogatli.”

Yangihayot district

Mahallas: “Mash’al,” “Navqiron,” “Al-Farg‘oniy,” “Vikor,” “Yuldosh,” “Chorbog‘,” “Zarbdor,” “Do‘stlik,” “Charogon,” “Yorqinhayot,” “Hushnud.”

Bektemir district

Mahallas: “Zilola,” “Rohat,” “Mirishkor,” “Iqbol.”

Local boiler shutdowns

On 5–6 October, the Olmazor mahalla in Shaykhantahur district will be affected at building No. 39.

From 5 to 9 October, hot water will be shut off in the Besh Kapa mahalla of Mirzo Ulugbek district at buildings No. 419, 421, 421a, 421b, 427a, 427b and 427v.

In the Paxtakor mahalla of Uchtepa district, the shutdown will affect buildings No. 5 and 6, School No. 81, Preschool Educational Institution No. 396, other facility No. 7 and the Children’s Infectious Diseases Hospital.

On 7–8 October, the Ukchi mahalla in Shaykhantahur district will be affected at building No. 29.

From 7 to 9 October, the Mirobod mahalla in Mirobod district will be affected at building No. 32, blocks No. 1, 2, 3, 5, 8 and 9.

The hot water shutdowns will begin at midnight on 5 October, at 00:00 on the night of 4–5 October.

Askar Yakubov
Askar Yakubov

Askar Yakubov is a professional photojournalist with extensive experience in news and reportage photography. He specializes in fast-paced coverage of social, political, cultural, international, business, and community events, with a sharp eye for capturing expressive shots and conveying the atmosphere of an event under tight time constraints. His skill set spans reportage, portrait, and documentary photography, along with image editing and color correction, and preparing photo materials for media and digital platforms. He is known for his professionalism, adherence to editorial standards, and ability to work both independently and as part of a shooting team.