Stay up to date with the latest news
Subscribe to our telegram channel
According to the Ministry, some 95,100 square meters of automobile roads with the length of 10.9 km were repaired.
It added that 8,700 square meters of asphalt-cement pavement was laid. About 28,288 square meters of roadside with the length of 9.9 km were strengthened.
Modern LED lightening system with the length of 1 km were installed as well.