Stay up to date with the latest news
Subscribe to our telegram channel
Tashkent, Uzbekistan (UzDaily.com) -- A filter in the interval of 3050-2863 meters was installed at well No. 329 of the Shurtan field of the Shurtan oil and gas production department of Uzbekneftegaz JSC after completion of drilling.
According to operational data, after the development of the well, an industrial gas inflow was obtained with a daily flow rate of 80 thousand cubic meters and 2 tons of gas condensate.
Currently, work is underway to equip the well and connect it to a gas collector.