Stay up to date with the latest news
Subscribe to our telegram channel
Tashkent, Uzbekistan (UzDaily.com) - Drilling operations at well No. 127 of Somontepa field of Mubarek oil and gas production department have been completed.
As a result of perforation work in the intervals of 2348-247 m, an industrial gas inflow was obtained with a daily flow rate of 96,800 cubic meters and 0.58 tons of condensate.
The Somontepa gas condensate field is located in Alat district of Bukhara region and was launched in 2006. Currently, 43 wells produce gas and condensate.