Tashkent, Uzbekistan (UzDaily.com) -- Acting khokim of Tashkent Bakhtiyor Rakhmanov and Minister of Construction, Housing and Communal Services Batir Zakirov studied several locations of the capital for the installation of local boiler houses in areas with a low rate of hot water circulation, which are the last point of the heat supply network.
The situation in multi-storey buildings in the area of operation of heating plant-9, located on the 14th quarter of the Uchtepa district, was studied, and the state of multi-storey residential buildings on the 7th quarter of the Chilanzar district was analyzed.
To ensure uninterrupted heat supply to apartment buildings in these quarters, responsible persons were instructed to take measures to build local boiler houses and insulate the facades of apartment buildings with basalt coating.