Stay up to date with the latest news
Subscribe to our telegram channel
Tashkent, Uzbekistan (UzDaily.com) -- Despite the insufficiency of electricity produced, experts are trying to distribute it throughout the country, trying to provide this volume, first of all, to the population and socially significant facilities. At the same time, it is clear that there are individual interruptions in the supply of electricity.
According to the press service of the Ministry of Energy of the Republic of Uzbekistan, the operation of hydroelectric power plants was initially restored. Currently, their production capacity is brought to the maximum performance.