Stay up to date with the latest news
Subscribe to our telegram channel
Tashkent, Uzbekistan (UzDaily.com) - At well No. 12 of the Uzunshor field of the Mubarek oil and gas production department, drilling is completed and a filter is installed in the interval 2464-2464 m. This was reported by the press service of Uzbekneftegaz JSC.
After well development, an industrial gas inflow with a daily flow rate of 200 thousand cubic meters was obtained.
Uzunshor gas condensate field is located in the Alat district of the Bukhara region and was commissioned in November 2019.