Stay up to date with the latest news
Subscribe to our telegram channel
Tashkent, Uzbekistan (UzDaily.com) - Overhaul was carried out at gas well No. 73 of the Shimoliy Berdak field of the Usturt gas production department. This was reported by the Uzbekneftegaz press service.
After the works on isolation of water inflow at the well were perforated overlying horizons in the interval 1592-1588 m.
As a result, after well development, an industrial gas inflow of 100-120 thousand cubic meters per day was obtained.
The Shimoliy Berdak gas condensate field is located in Muynak region of the Republic of Karakalpakstan and was commissioned in 2006.