Currency rates from 19/09/2025
$1 – 12314.71
UZS – 0.49%
€1 – 14579.39
UZS – 0.43%
₽1 – 148.26
UZS – 0.25%
Search
Administrative building of Ahangarancement’s mining shop commissioned
Administrative building of Ahangarancement’s mining shop commissioned

Administrative building of Ahangarancement’s mining shop commissioned

Tashkent, Uzbekistan (UzDaily.com) -- Administrative building of the mining shop of Ahangarancement, which is part of Eurocement Group (Russia), has been commissioned.

According to the Russian company, the cost of the works is over 200 million soums. The works were carried out within three months.

The walls of the administrative building of the mining shop were strengthened. The façade and roof were updated. The doors and windows were replaced. The electricity facilities were fully replaced. Modern electric boilers for heating and hot water were installed.

The company recalled that it opened kitchen on the first floor of the building in 2008 and now the reconstruction of the building was fully completed.

Stay up to date with the latest news
Subscribe to our telegram channel