Dori Darmon constructs logistic center in Gulistan
30/08/2013 10:06
Dori Darmon constructs logistic center in Gulistan
30/08/2013 10:06
Tashkent, Uzbekistan (UzDaily.com) -- Dori Darmon joint stock company completed construction of a building of Logistic Center “Syrdarya Dori Darmon” in Gulistan, Syrdarya region of Uzbekistan.
The company said that the logistic center is located at the area of 4,740.37 square meters and it is equipped with modern equipment for storage, transportation and load of medicaments.
The administrative corpus is equipped with air conditioners, computers and furniture.
Five modern ventilators and air conditioners were installed to keep temperature conditions to store medicaments. The company has storages cameras to keep medicaments in low temperature.
Dori Darmon installed 36 units of multitiered racks and trays. The company also purchased two modern hydraulic pallet trucks LEMA LM -25 and one autoloader to load medicaments.
The second and third floors of the center are warehouses to store medicaments. They also equipped with modern ventilation and air conditioners, cold storage cameras, racks and trays, autoloaders, pallet trucks, etc.
30/04/2024Read more
$ 1 | 12697.00 | 0.000% |
1 | 13547.70 | 0.000% |
₽ 1 | 135.05 | 0.000% |