Tashkent, Uzbekistan (UzDaily.com) -- Concrete splinters from the subway under construction in Sergeli district of Tashkent damaged the window of the Afrosiyob high-speed train. This was reported by the press service of the Ministry of the Interior.
According to the Ministry of Internal Affairs, this incident occurred on 23 June near the Sobir Rakhimov railway station.
During the investigation of the incident, it turned out that during the construction of the Tashkent metro in the Choshtepa mahalla of Sergeli district of Tashkent on the subway bridge over the railroad tracks, the concrete pump was laid on the concrete pump, which did not have time to harden.
And this caused concrete fragments to hit the window of the high-speed passenger train Afrosiyob, which was moving in the direction of Bukhara-Tashkent.
The investigation is being conducted by the Tashkent-Yuzhny Railway Station Security Administration.