Stay up to date with the latest news
Subscribe to our telegram channel
Tashkent, Uzbekistan (UzDaily.com) -- At well No. 206 of the Alan field of the Mubarek oil and gas production department, after completion of drilling, a filter was installed in the interval 2949-2747 meters. This was reported by the press service of Uzbekneftegaz JSC.
According to operational data, after well development, an industrial gas inflow with a daily flow rate of 120 thousand cubic meters and 2.8 tons of gas condensate was obtained.
Currently, work is underway to equip the well and connect it to the gas manifold.