Stay up to date with the latest news
Subscribe to our telegram channel
Tashkent, Uzbekistan (UzDaily.com) -- Drilling was completed at well No. 204 of the Alan field of the Mubarek Oil and Gas Production Department and a filter was installed in the interval 2762-2940 m, the press service of Uzbekneftegaz said in a statement.
After well completion, an industrial gas inflow was obtained with a daily flow rate of 120 thousand cubic meters and 2.8 tons of condensate.
The Alan gas condensate field is located on the territory of Mirishkor district of Kashkadarya region and was commissioned in 1979.