Stay up to date with the latest news
Subscribe to our telegram channel
Tashkent, Uzbekistan (UzDaily.com) – Over well No. 12 of the Oydin field of the Shurtan oil and gas production department was overhauled by the efforts of Oil and Gas Kuduularini Sinash JSC. This was reported by the press service of Uzbekneftegaz JSC.
Also, perforation work was carried out at the well in the intervals of 2735-2724 m.
As a result, an industrial gas inflow with a daily flow rate of 50 thousand cubic meters and 1 ton of gas condensate was obtained.