Currency rates from 28/10/2025
$1 – 12053.46
UZS – -0.53%
€1 – 14026.61
UZS – -0.3%
₽1 – 152.43
UZS – 1.97%
Search
Enter Engineering to build oil pipeline for Uzbek refinery Jul-Dec
Enter Engineering to build oil pipeline for Uzbek refinery Jul-Dec

Enter Engineering to build oil pipeline for Uzbek refinery Jul-Dec

Tashkent, Uzbekistan (UzDaily.com) -- Enter Engineering Pte Ltd., controlled by Russia’s Gazprombank group, plans to begin construction of a US$2.2 billion pipeline from a new oil refinery in Uzbekistan to the border with Kazakhstan in July-December, the company’s representative told PRIME on Thursday.

Construction of the facility started in April 2017. In June, Gas Project Development Central Asia AG, a subsidiary of Gazprom International, and Uzbekneftegaz set up the Jizzah Petroleum joint venture with 40% and 60%, respectively. Enter Engineering is the general contractor.

The Enter Engineering said that geographic and topographic surveys on the pipeline’s route are now performed.

Uzbekneftegaz said earlier that a 100-kilometer pipeline will be built to plug into the Omsk-Pavlodar-Chimkent pipeline in Kazakhstan to supply the refinery with crude.

The refinery will refine 5 million tonnes of hydrocarbons from Russia and Kazakhstan annually to produce 3.7 million tonnes of Euro-5 gas motor fuel, 700,000 tonnes of aviation fuel, and 300,000 tonnes of associated products including liquefied natural gas, heating oil and benzol.

Stay up to date with the latest news
Subscribe to our telegram channel