Currency rates from 29/08/2025
$1 – 12482.38
UZS – 0.56%
€1 – 14540.72
UZS – 1.07%
₽1 – 155.23
UZS – 0.62%
Search
Uzbekistan 08/06/2020 Construction based on the project “Modern Mahalla” in 14 district mahallas is determined
Construction based on the project “Modern Mahalla” in 14 district mahallas is determined

Tashkent, Uzbekistan (UzDaily.com) -- A draft resolution of the Cabinet of Ministers of the Republic of Uzbekistan “On the integrated development of the Yashnabad district of Tashkent in 2020-2022” was put up for discussion on the portal for discussing draft regulatory documents.

The project was prepared with the aim of organizing the rational use of production and labor potential, the development of services and entrepreneurship, the targeted use of empty and unfinished buildings and structures of the Yashnabad district of the capital.

The document contains projects and locations for the development of industry and services, the improvement of natural gas supply infrastructure, the construction, reconstruction and modernization of clean drinking water and sewer networks, the construction of new and the repair of existing preschool educational and general educational institutions.

Also, the construction of modern buildings of the mahalla committees on the basis of the “Modern Mahalla” project in 14 district mahallas was determined.

Stay up to date with the latest news
Subscribe to our telegram channel