Stay up to date with the latest news
Subscribe to our telegram channel
Tashkent, Uzbekistan (UzDaily.com) - A major overhaul was conducted in Mubarek oil and gas production department in well No. 119 of the Janubiy Kemachi field to isolate water inflow and perforate the reservoir.
As a result of well development, an industrial inflow of natural gas was obtained with a preliminary daily flow rate of 45 thousand cubic meters and 0.5 tons of gas condensate.
A few days ago, also as a result of overhaul from a well No. 157 of the same field, a daily gas inflow of 50 thousand cubic meters and 0.7 tons of gas condensate was obtained.