Resolution of the Cabinet of Ministers on preparation for the heating season adopted
27/09/2022 22:05
Resolution of the Cabinet of Ministers on preparation for the heating season adopted
27/09/2022 22:05
Tashkent, Uzbekistan (UzDaily.com) -- Resolution of the Cabinet of Ministers No. 522 defines specific tasks to ensure a stable heating season in the country in all areas. This was announced by the Deputy Minister of Housing and Communal Services Kurbon Tursunov.
- Capital and current repairs of 2967 multi-apartment housing stock are planned;
- Capital and current repairs of 1815 km of drinking water supply networks are planned;
- Capital and current repairs of 1689 pumping equipment are planned;
- Capital and current repairs of 24 central and local boiler houses are planned;
- Capital and current repairs of 809 boilers of various brands are planned;
- Capital and current repairs of 737 km of heating networks are planned;
- Capital and current repairs of 88,080 km of power transmission lines are planned;
- Capital and current repairs of 29,135 transformer substations are planned.
Together with the repair of 149 km of gas pipelines and 299 gas distribution points, the supply of 314,400 tons of liquefied gas will be ensured and reserves of 1 million 700 tons of coal will be formed.
28/03/2024Read more
28/03/2024Read more
$ 1 | 12570.00 | +0.024% |
1 | 13698.79 | -0.378% |
₽ 1 | 136.91 | -0.270% |