Uzbekneftegaz completes the planned repair work of the gas processing plant "Gazli"
18/11/2020 15:58
Uzbekneftegaz completes the planned repair work of the gas processing plant "Gazli"
18/11/2020 15:58
Tashkent, Uzbekistan (UzDaily.com) -- In order to increase productivity and efficiency, the plant first dismantled unnecessary and redundant pipes, filters and valves at the inlet of the CNS-300/600 pump, all air defense systems were inspected and unusable were replaced with new ones.
Also, the CNS-300/600 pumps were completely repaired, mounted and centralized in the repair shop.
In addition, the anchors of pumps N-1, 2 have been fully tested - instead of the old frames (beds), new frames have been mounted at the Uzbekkhimmash plant, and the concrete coating has been updated.
The pump outlet pipe was completely flaw-tested and the defective parts were replaced.
The redundant check valve installed in the common MDEA manifold was dismantled. Valve platforms for servicing the pumping fleet were installed. Supports are installed on the inlet-outlet pipes.
The internal parts of the desorption apparatus, hatches, gas pipes, which are part of the evaporator, were covered with stainless and corrosion-resistant metal by mutual agreement with the specialists of Uzbekkimyomash.
The integrity of the internal parts and elements of the apparatus was checked, completely washed off from various mechanical waste and prepared for operation.
A number of shortcomings noted in air coolers (AVO) were eliminated, protocols were drawn up for installing a storage tank for MDEA storage in a vertical state of 200 m3 instead of a storage tank for MDEA storage in a horizontal position operating in the E-102/4 network.
Together with the specialists of the Shurtan Gas Chemical Complex, ultrasonic testing and ultrasonic testing were carried out on the Desorber, Absorber and other devices of the network, as well as on the inlet and launch pipelines.
According to the Main Department of Mechanics of the Department of Technical Regulation of Production, assembly and dismantling works were carried out in the above pump park together with specialists from the Bukhara oil refinery.