Herrenknesht’s equipment used to construct metro in Tashkent
13/02/2019 19:40
Herrenknesht’s equipment used to construct metro in Tashkent
13/02/2019 19:40
Tashkent, Uzbekistan (UzDaily.com) -- A construction of metro is underway in Tashkent. Currently, Uzbekistan Temir Yollari (Uzbekistan Railways) is constructing stations of Yunusabad metro line.
Currently, construction and installation works of the new stations Yangi Yunusobod and Turkiston are under way, the press service of Uzbekistan Temir Yollari said in a statement.
For conducting the closed construction works, a tunnel-driving machine of the German company Herrenknesht AG is involved.
This complex performs not only tunneling work, but at the same time strengthens the underground passage. The finished concrete tunnel consists of tubings, which are separate segments of the tunnel ring. Our specialists now make these elements of prefabricated fasteners.
The new plant of Kuprikkurilish, which produces specialized reinforced concrete products and structures, has mastered production of tubing. It increases production volume.
Product quality is under the constant supervision of specialists. Every day, 8 sets of products are manufactured here, the total length of which is 12 meters.
23/04/2024Read more
$ 1 | 12667.00 | +0.022% |
1 | 13481.49 | -2.022% |
₽ 1 | 135.77 | -0.506% |